Lakeridge Middle School
Lake Oswego, OR
Business Type
New replacement middle school
Size
150,000 square feet
Architect
Mahlum
Owner
Lake Oswego School District
Certifications
- Participated in Oregon's Path to Net Zero Energy program
- Designed to meet Architecture 2030 energy targets
Built with sustainability, accessibility, and mental health in mind, the new school that takes the place of the Waluga Junior High and Bryant Elementary School, features tech-savvy learning studios for over 1,100 students.
Special Features
- Projected EUI of 21.7 compared to typical EUI of 48.5 for schools
- Paired a smaller mechanical system with a high-performance envelope to accommodate budget constraints
- Biophilic elements support student health, comfort, and productivity
- Uses seven different specialty timber products including whole trees
- No fossil fuel use as an all-electric building
- PV ready with initial 190 kW array installed
- Passive cooling design with hybrid mechanical system
- Designed for passive resiliency via upgrades to building structure and envelope
Contractor
Skanska